Prices
The Prices setting picks how much building costs. Fair (the default) takes a little off the book's prices, more off the dearest works; Thrifty takes more off; DMG keeps the book's. Small jobs keep their price. The setting also sets what a building crew costs to hire and its upkeep a turn.
| Base price (DMG) | 50 | 250 | 500 (Cramped room) | 1,000 (Roomy) | 3,000 (Vast) | 7,500 | Crew: hire / upkeep a turn | Every building once |
|---|---|---|---|---|---|---|---|---|
| DMG | 50 | 250 | 500 | 1,000 | 3,000 | 7,500 | 50 / 10 | about 340,000 |
| Fair (default) | 49 | 230 | 440 | 850 | 2,410 | 5,760 | 40 / 8 | about 266,000 |
| Thrifty | 50 | 215 | 405 | 750 | 2,020 | 4,610 | 25 / 5 | about 217,000 |
A base price is per room, per square of wall or per mile of road, before terrain, hauling, the region's danger, rush and the other factors. Planned projects are re-priced when the setting changes; ones under way keep their price, and gold paid beyond a new, lower price goes into the treasury.
Build pace
Adventures don't last years, so by default (Adventure) building is far quicker than the DMG's times: a room takes 2 / 4 / 8 days (Cramped / Roomy / Vast), a chapel 3, a gatehouse 5, a great hall 8, a harbor 10 and a 40-square stone wall 19. Short jobs shrink about tenfold and long ones about twentyfold, since big works bring more hands. More crews on a project divide these.
The Build pace setting switches to Campaign (about a third of the DMG's time) or DMG (as written). Prices don't change with the pace. Unfinished projects are re-timed when it changes, keeping the share of work done.
With the long-rest clock, a day of work is one long rest: see Time and Turns.
Your own numbers
In House Rules and Catalog: price: { scale, power } (price = scale × price^power), pace: { scale, power } (days = scale × days^power), costMult, crewHireCost, crewUpkeep, maxHiredCrews, maxExtraCrews and extraCrewCostPct (a surcharge per extra crew on a project, 0 by default).
This page mirrors the Player Bastions wiki on GitHub.