Dxcufgb's Workshop

Building

WIPWork in progress: may be very buggy and can change a lot between versions.

Everything new at the Bastion is a project on the Projects tab: a new building, an upgrade, an enlarged room, a repair or extending the grounds.

The catalog

69 expansions in seven groups:

Group Expansions
Rooms (6) Bedroom, Dining Room, Parlor, Courtyard, Kitchen, Storage (Cramped, Roomy or Vast, at the DMG's prices)
Fortifications (14) Wall, Spike Barricade, Gatehouse, Barbican, Portcullis and Murder Holes, Drawbridge, Arrow Slits and Hoardings, Watchtower, Dry Ditch, Wet Moat, Ballista Emplacement, Postern Tunnel, Lesser Wards, Greater Wards
Supplies and infrastructure (12) Granary, Well, Deep Well, Cistern, Smokehouse and Salt Store, Kitchen Garden, Orchard, Fields and Tenant Farms, Livestock Pens, Mill, Hunting Lodge, Workers' Lodge
Access and travel (10) Clear a Trail, Build a Road, Pave the Road, Timber Bridge, Stone Bridge, Pier, Harbor, Waystation, Coach House and Remounts, Hidden Approach
Trade and income (12) Market Square, Inn, Brewery, Craftsmen's Row, Warehouse, Merchant Charter, Tollgate, Lumber Camp, Quarry, Mine, Trading Company, Strongroom
Staff and prestige (10) Servants' Quarters, Bathhouse, Chapel, Infirmary, Training Yard, Garrison Hall, Great Hall, Guest Wing, Steward's Office, Pleasure Gardens and Statuary
Communication and arcane (5) Rookery, Beacon Tower, Sending Stone Station, Scrying Pool, Arcane Lanterns

Each has its own cost, build time, room it takes and perks. Revenue buildings have tiers and can make the Bastion pay for itself. The catalog only shows what can be planned right now. The GM can change, hide or add expansions: see House Rules and Catalog.

One of everything: a summary under the catalog shows the gold and the long rests (or days) one of every building still missing would take: the smallest rooms, the wall round as a palisade, a road to the settlement, at today's prices, with one crew, one after another, by group and in all.

Who does what

  • Players plan projects, pay for them, put them in the build queue and order it, and hire building crews.
  • The GM also starts, pauses, resumes, re-crews and cancels projects, and can finish one at once (Finish now) or every unfinished one (Finish all, in the Build header).

The Funding and Build headers show the totals: gold paid in of the total, and work done of the total.

The build queue

Put planned projects in the queue with Queue and order them with the arrows. Queued projects start by themselves, in that order, the moment a crew is free and they are paid for, so the next one starts as soon as one is done. A queued project that isn't paid for yet lets the next one go first. The list shows running projects first, then the queue ("Queued #1", "#2" ...), then the other plans, closest to done first.

Building crews

A Bastion starts with one building crew, so it builds one project at a time.

  • Hire more crews on the Projects tab: 40 GP each and 8 GP upkeep a turn at Fair prices (see Prices and Build Pace), up to 4, paid from the treasury or a character. Crews at work can't be dismissed.
  • Each Workers' Lodge brings one crew with no upkeep.
  • A counter shows the crews at work of the total.
  • A project can take one crew or more: more crews, the same price and less time. No more crews can be at work than the Bastion has, so a project only starts, resumes or takes more crews when they are free.

What's built

The Built list shows every building with its Enlarge, Upgrade and Repair buttons. A building with a project planned or under way shows "Enlarging: Planned" (and so on) instead, so it can't be planned twice.

When a project finishes, rooms become dnd5e basic facility items on the owners' sheets, and the battle map is redrawn.

This page mirrors the Player Bastions wiki on GitHub.